A storm bringing have heavy winds and up to an inch of rain to Andover had knocked out power to 11 percent of Andover’s customers as of 11:30 a.m. on Monday.
National Grid had yet to set an estimated time for when the 1,578 customers would have power restored.
There was some good news: the National Weather service is predicting the Shawsheen level would stay below the flood stage of 29 feet. The water level was measured at 26.91 feet at 11 a.m. Monday.
This is a breaking news story. Check back for updates throughout the day.
Share Your Thoughts!